Stationary generator 72 kW AP 100 I5 - STAGE 5
AP 100 I5 three-phase generator – power, silence and Stage V compliance
What is the AP 100 I5 generator?
The AP 100 I5 is a modern three-phase generator with a maximum output of 100 kVA / 80 kW , powered by a reliable IVECO Stage V engine that meets stringent emission standards. It is a solution for companies requiring backup or continuous power in workshops, offices, warehouses, and service facilities.
Key technical parameters of the AP 100 I5 generator?
-
ESP maximum power: 100 kVA / 80 kW
-
PRP rated power: 90 kVA / 72 kW
-
Rated current: 214 A
-
Nominal voltage: 400 V
-
Frequency: 50 Hz
-
Generator: STRATHON ECO 105 KW, brushless, synchronous
-
Generator efficiency: 93%
-
Protection class: IP 23
-
Insulation class: H
Why choose the AP 100 I5 unit?
What makes the AP 100 I5 generator stand out?
✅ IVECO Stage V engine: Model F36ETVP03 with a capacity of 3.6 l and a power of 94 kW – compliant with Directive 97/68/EC.
✅ Full automation: The AMF 25 controller automatically starts the generator, keeps an event log, allows monitoring and remote operation (GSM, LAN, Modbus).
✅ Quiet operation: In a soundproof housing, the noise level is only 70 dB(A) at a distance of 7 m – ideal for use in urban areas.
✅ Low fuel consumption: Only 22.9 l/h at full load, large 300 l tank ensures long operation.
Where is the AP 100 I5 generator best suited?
AP 100 I5 is a reliable power source for:
-
workshops and service facilities,
-
offices and administrative facilities,
-
shops and service outlets,
-
small warehouses and logistics centers,
-
facilities where compliance with Stage V emissions standards is important.
What additional options does the AP 100 I5 offer?
You can expand the unit with:
-
external fuel tank,
-
differential protection,
-
spark arrester,
-
synchronization with other units,
-
remote monitoring (GSM, LAN, RS232/485, GPRS),
-
ventilation and exhaust system,
-
version with a different voltage configuration,
-
external SZR cabinet (IP54),
-
foundation slab.
What is the service and operation of AP 100 I5 three-phase generators like?
How to care for the generator?
? Oil and filter change: after the first 100 hours of operation, then every 500 hours or annually.
? Coolant: replace every 1000 hours or every 2 years.
? AMF 25 Controller: enables remote viewing, SMS/email notifications and operation via the InteliMonitor or WebSupervisor application.
What are the warranty conditions for the AP 100 I5?
-
Reserve mode: 60 months (or 1000 operating hours).
-
Continuous operation mode: 12 months (or 1000 operating hours).
Choose a modern power supply with AP 100 I5
The AP 100 I5 ensures reliable operation, compliance with the latest emission standards and quiet operation in all conditions.
Contact us and request an offer tailored to your needs!
- Execution
-
Built-up
Suitable for mounting on a trailer - Maximum power ESP kVA
- 100 kVA
- Maximum power ESP kW
- 80 kW
- Rated power PRP kW
- 90 kVA
- Rated current
- 72 kW
- Tension
- 400V
- Frequency
- 50 Hz
- Engine
- FPT Iveco
- Fuel type
- Diesel
- Exhaust emissions
- Stage 5
- Fuel consumption 100% l/h
- 22.9 l/h
- Fuel tank
- 300 l
- Dimensions L x W x H
- 2890 x 1110 x 1750 mm
- Application
-
Business
Construction
Health service
Industry - Weight
- 2120 kg


